Project Description

1
OLYMPUS DIGITAL CAMERA

Before

2
OLYMPUS DIGITAL CAMERA

Before

3
4
5
6
6b

Before

7
7b

Before

previous arrow
next arrow

vision & challenges

  • renovated main floor 5 years ago – challenge was matching new reno design with previous; all family members involved in design and details finalized by e-mail while overseas for three months

design solutions

  • replaced cherrywood wall in stairwell with glass railings
  • relocated master bedroom door; reconfiguring closet access provided space for new office in hallway
  • matched floor-to-ceiling ledger stone on office wall to main-floor fireplace; both visible from stair landing; office shelves with integrated lighting/solid surface countertop/hidden wiring chase for cables/surface access panel/plugs with USB ports/enclosed storage
  • removed main bathroom tub, door access from bedroom and relocated toilet/vanity; mounted mirror on sliding rail for window access
  • used 4-light opaque glass on bathroom doors for continuity with main floor
  • created “Zen” master suite – ensuite with walk-in shower; multi-function rain-shower/heads; strip drains; oversized single sink; storage beside shower
  • matched custom closet details, wood flooring/stairs/handrails/stair lights to main floor finishes
  • upgraded soundproofing in all bedrooms – teens can play music without disturbing others

Related projects